We recognize that as a user of an ejector system, you are confronted with
analyzing capital cost when equipment is purchased, as well as operating cost once the equipment
is installed. Efficient operation is an important evaluation criteria because
controlling energy consumption and waste production is always a priority for you.
Graham continues to make strides toward improving ejector operating efficiencies
so that less motive consumption is required. Condensation efficiency and
hydraulic performance in the inter and after condensers associated with the
ejector system remain our priority. There are options you should consider in the
evaluation of an ejector system. For any application, it is possible to design
the ejector system for low capital cost, but high operating cost, or conversely,
low operating cost, but higher capital cost, or anywhere in between those two extremes.
We can review the options with you. |